PROJECT

Sierra Freezer Expansion

Developer Partner: Tippmann Design Build

Project Details

  • 170,000 SF freezer & processing area slab on grade
  • Single source contract
  • Floor Tolerance: Fmin 100 SUPER FLAT floor for freezer area to accommodate 60’ high racking system
  • Intricate sloped concrete floors in processing area to meet CFIA requirements
  • Wall protection concrete curbs throughout the facility
  • Poly Urethane resinous flooring to all processing rooms
  • Developer Partner: Tippmann Design Build

Project Image Gallery

Skip to content